90 sea-view residences in the heart of modern living
| Kind | Issued by | Date | Reference |
|---|---|---|---|
| Occupancy Permit (İskan) | Bakırköy Belediyesi İmar ve Şehircilik Müdürlüğü | 10/1/2026 | DEMO-IS-2026-5678 |
Indicative only; final contract terms are agreed with the sales team.
All 3 blocks: insulation + EPS layer + final ETICS render applied; energy-class A certification on track.
Block A interior: drywall + electrical + plumbing rough-in complete; tile + paint phase starts in 2 weeks.
All 3 blocks now topped out at 10F. Total RC concrete poured: 4,800 m³.
Block A topped out at 10F. Roof + parapet poured + waterproofed; ready for facade installation.
Block B reached 5th floor; Block A topped out at 7F; Block C foundation rebar complete.
Block A topping out: reinforced concrete shell reached 3rd floor; pace target: 1 floor per 8 days.
Block A + B foundations poured (1,400 m³ C35 concrete); Block C in progress.
Site excavation completed across all 3 blocks. Soil samples sent for final lab analysis.